Post by Terry Winston Thu Dec 08, 2011 8:31 pm

-Church refurbishment-

Construction status [COMPLETE]

Work list:

Refurbish grounds [DONE]
Bring new power and water mains to building [DONE]
Repair all exteriour walls [DONE]
Under pin foundations [DONE]
Fit new stain glass windows [DONE]
Add new oak church doorway [DONE]
Re plaster all interiour walls [DONE]
Install kitchen area [DONE]
Stone slab tile church floor [DONE]
Install new church organ [DONE]
Install new church benches [DONE]
Re wire and plumb building [DONE]
Install speakers and alter [DONE]
Re decorate entire inside and out [DONE]
Clean entire property [DONE]
Final inspection [DONE]

-------------------------------------------------
[Job hand over]
Solarin Construction
-------------------------------------------------
Date:

Amount paid $5500
Amount Owed $0

Signature required
Terry Winston -..........................
Ferdinad Brixius -..........................


Last edited by Terry Winston on Fri Dec 23, 2011 7:30 pm; edited 1 time in total
Terry Winston
Terry Winston
In Game Administrator
In Game Administrator

Posts : 638
Join date : 2011-06-02
Age : 32
Location : England

Back to top Go down

Completed work Empty Re: Completed work

Post by Terry Winston Thu Dec 08, 2011 8:32 pm

-Motel and Wolf Inn Repairs-

Construction status [COMPLETE]

Work list:

Fix all dripping/leaking pipes [DONE]
Repair the the exteriour walls [DONE]
Install new cctv cameras around property [DONE]
Clean work area [DONE]
Final inspection [DONE]

-------------------------------------------------
[Job hand over]
Solarin Construction
-------------------------------------------------
Date:04/12/2011

Amount Paid $1000
Amount Owed $0

Signature required
Terry Winston -terry winston
David Reece -david reece
Terry Winston
Terry Winston
In Game Administrator
In Game Administrator

Posts : 638
Join date : 2011-06-02
Age : 32
Location : England

Back to top Go down

Completed work Empty Re: Completed work

Post by Terry Winston Wed Dec 14, 2011 10:20 pm

-Dick's sounds rebuild-

Construction status [Complete]

Work list:

[Phase 1] [Complete]

Demolition and clearing of site [DONE]
Lay new foundations [DONE]
Bring a new water and electric connection from road [DONE]
begin rebuilding exteriour cavity wall [DONE]

[Phase 2]
Build wooden skelton of roof [DONE]
waterproof roof [DONE]
install drainage for flat roof
Tar mac new roof

[Phase 3]
Install windows and doors [DONE]
install internal partition walls [DONE]
Re wire building [DONE]
Re plumb building [DONE]

[Phase 4]
Plaster/render all internal and external walls [DONE]
install all fixture and fittings (i.e lights/toilets) [DONE]
install counters and shelves [DONE]
Decorate inside and out [DONE]
Clean entire site [DONE]
Finial Inspection [DONE]





-------------------------------------------------
[Job hand over]
Solarin Construction
-------------------------------------------------
Date:14/12/2011

Amount paid $9000
Amount Owed $0

Signature required
Terry Winston -..........................
Nicolas Djordjevic -..........................
Terry Winston
Terry Winston
In Game Administrator
In Game Administrator

Posts : 638
Join date : 2011-06-02
Age : 32
Location : England

Back to top Go down

Completed work Empty Re: Completed work

Post by Ferdinand Brixius Fri Dec 23, 2011 7:20 pm

((I've signed and paid the full amount if you could clarify this on here, thanks.))
Ferdinand Brixius
Ferdinand Brixius
Donator
Donator

Personal Text : I don't care what you think about my signature, I'm protecting my freedom.
Posts : 652
Join date : 2011-01-31
Age : 27
Location : Birmingham, England.

Back to top Go down

Completed work Empty Re: Completed work

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum